13 days left — Registration closes 2026-10-31.

Week 4 · Day 26 of 30

Science, space and technology

Humans fly round the Moon for the first time since 1972, ISRO's workhorse rocket fails twice running, India ships its first memory chips, Indian-built AI models arrive, and an AI company holds back a model it judged too capable at finding software flaws.

5 stories · 7 questions · every story sourced

Artemis II takes four astronauts around the Moon

10 April 2026

NASA's Artemis II lifted off on the Space Launch System from Kennedy Space Center on 1 April 2026 and splashed down in the Pacific off San Diego on 10 April. The Orion spacecraft flew a free-return path around the far side of the Moon without landing or entering lunar orbit, the first crewed flight to the Moon's vicinity since Apollo 17 in 1972. The crew was Reid Wiseman (commander), Victor Glover, Christina Koch and Canada's Jeremy Hansen, the first non-American to fly to the Moon.

Background. Artemis I was uncrewed (2022). Later Artemis missions aim to land astronauts near the lunar south pole, where water ice is thought to exist; India's Chandrayaan-3 landed near the south pole in August 2023. India signed the US-led Artemis Accords in 2023.

Why CLAT asks: Mission firsts and India's link (the Artemis Accords, Chandrayaan-3 near the south pole) are easy marks.

Sources: NASA: Artemis II; WHIO (ABC News): Artemis II crew exits spacecraft after successful splashdown

PSLV-C62 fails; the rocket's second failure in a row

12 January 2026

ISRO's PSLV-C62, launched from Sriharikota on 12 January 2026 carrying the Earth observation satellite EOS-N1 (Anvesha) and 15 co-passengers, failed to reach orbit when its third, solid-fuel stage developed a disturbance in roll rates near burnout, ISRO Chairman V. Narayanan said. All 16 payloads were lost. It was the PSLV's second consecutive failure involving the third stage, after PSLV-C61 with EOS-09 in May 2025.

Background. The Polar Satellite Launch Vehicle has four stages, alternating solid and liquid; its first successful flight was in 1994, and in 2017 PSLV-C37 placed a record 104 satellites in orbit. ISRO's heavier rocket is the LVM3, which launched Chandrayaan-3.

Why CLAT asks: PSLV versus GSLV/LVM3, and the 104-satellite record, are common space questions.

Sources: Spaceflight Now: India's PSLV suffers second consecutive launch failure, 16 satellites lost (12 January 2026); The Week: PSLV-C62 mission encounters 'anomaly' at end of PS3 stage

First Made-in-India memory modules ship from Micron's Sanand plant

28 February 2026

Micron's assembly and test plant at Sanand, Gujarat opened on 28 February 2026, and in March shipped the first Made-in-India memory modules to customers including Dell and HP. It packages and tests chips; it does not make wafers. India's first commercial wafer fab, by Tata Electronics with Taiwan's PSMC at Dholera, Gujarat, is meant to make 28-nanometre and older chips, with first output expected from late 2026 at the earliest.

Background. The India Semiconductor Mission was launched in December 2021 with an outlay of ₹76,000 crore. OSAT stands for Outsourced Semiconductor Assembly and Test.

Why CLAT asks: The difference between a fab (makes wafers) and an OSAT (packages and tests) is a likely trap.

Sources: Zetwerk: India semiconductor manufacturing 2026; tele.net: India seeks to strengthen its semiconductor value chain with fresh investments

Sarvam's India-built AI models arrive under the IndiaAI Mission

March 2026

Bengaluru's Sarvam AI was chosen in April 2025 as the first company to build an Indian foundation model from scratch under the IndiaAI Mission, with government compute support. In February and March 2026, around the AI Impact Summit, it released models trained in India, including Sarvam 30B and Sarvam 105B, built for Indian languages and voice. It is one of several teams funded under the Mission's foundation-model track.

Background. A 'sovereign' model is trained and hosted within the country, on its own data and compute, so it does not depend on foreign providers. The IndiaAI Mission was approved in March 2024 with about ₹10,372 crore, much of it for shared GPU compute.

Why CLAT asks: What 'sovereign AI' means and why governments want it make a plausible reading-comprehension theme.

Source: Business Today: India selects Sarvam to build sovereign AI model under IndiaAI Mission (April 2025)

Project Glasswing: an AI model held back for its hacking ability

7 April 2026

On 7 April 2026 Anthropic announced Project Glasswing, giving a small group of technology and security companies, including Amazon Web Services, Apple, Google, Microsoft, NVIDIA, Cisco and the Linux Foundation, access to an unreleased model, Claude Mythos Preview, to find and fix flaws in critical software. Anthropic said the model had found thousands of serious, previously unknown vulnerabilities across major operating systems and browsers, which were reported for patching, and that it would not release the model publicly until safeguards were ready.

Background. A 'zero-day' is a flaw unknown to the software's maker, so no fix exists when it is found. 'Responsible disclosure' means telling the maker privately so it can patch before details are published. India's national agency for cyber incidents is CERT-In, under the IT Act.

Why CLAT asks: Dual-use technology, useful for defence and attack alike, is a classic theme for passages on regulating AI.

Sources: The Hacker News: Anthropic's Claude Mythos finds (April 2026); Infosecurity Magazine: Anthropic launches Project Glasswing to use AI to find and fix critical software vulnerabilities

Test yourself on day 26

Time Left
05:50
Answered
0 / 7
Q1.

Artemis II (April 2026) was the first crewed flight to the Moon's vicinity since:

Q2.

Which country's astronaut flew on Artemis II, becoming the first non-American to travel to the Moon?

Q3.

The PSLV-C62 failure of January 2026 was traced to a problem in which stage?

Q4.

Which ISRO mission set a record by placing 104 satellites in orbit in a single launch?

Q5.

Micron's Sanand plant, which began shipping in 2026, is an OSAT unit. What does it do?

Q6.

Under which government programme was Sarvam AI chosen to build India's first foundation model from scratch?

Q7.

In cybersecurity, a 'zero-day' vulnerability is one that:

Day 26: answers and explanations

  1. Artemis II (April 2026) was the first crewed flight to the Moon's vicinity since:

    Answer: A. Apollo 17 in 1972

    Apollo 17 (December 1972) was the last crewed lunar mission before Artemis II.

  2. Which country's astronaut flew on Artemis II, becoming the first non-American to travel to the Moon?

    Answer: B. Canada

    Jeremy Hansen of the Canadian Space Agency was a mission specialist.

  3. The PSLV-C62 failure of January 2026 was traced to a problem in which stage?

    Answer: D. The third (solid) stage

    A disturbance in roll rates near the end of the third stage's burn sent the rocket off its path, as in PSLV-C61 in 2025.

  4. Which ISRO mission set a record by placing 104 satellites in orbit in a single launch?

    Answer: C. PSLV-C37 (2017)

    PSLV-C37 launched 104 satellites in February 2017. LVM3-M4 launched Chandrayaan-3; PSLV-C25 launched Mangalyaan.

  5. Micron's Sanand plant, which began shipping in 2026, is an OSAT unit. What does it do?

    Answer: D. Assembles, packages and tests chips

    OSAT means Outsourced Semiconductor Assembly and Test. Wafer fabrication is the planned Tata-PSMC fab at Dholera.

  6. Under which government programme was Sarvam AI chosen to build India's first foundation model from scratch?

    Answer: B. IndiaAI Mission

    Sarvam was selected in April 2025 under the IndiaAI Mission's foundation-model track.

  7. In cybersecurity, a 'zero-day' vulnerability is one that:

    Answer: C. Is unknown to the software's maker, so no fix yet exists

    Zero-day flaws are unknown to the vendor; Project Glasswing (April 2026) was set up to find and patch such flaws.

Prepare with CLATcoach, free

A free account gives you a full mock, a past paper for every exam, the daily questions, twelve Legal GK headings and a report on where you stand.

Create a free account